New Central Utility Building for Kaplan Center for Wellness
The University of North Carolina at Greensboro – NC


As a part of the Kaplan Center for Wellness project effort, a central utility building was designed and constructed to support this wellness center.

The Central (N+1) Chilled Water Plant is of the primary variable flow design with the three (3) nominal 300-ton chillers arranged for parallel operation. The Central (N+1) Gas-Fired Hot Water Boiler Plant is of the constant flow primary/variable flow secondary design with five (5) nominal 60 BHP hot water boilers piped in parallel.