Regional Utility Plant No.4
The University of North Carolina at Charlotte – NC


McCracken & Lopez, P.A. teamed with Little Diversified in 2011 to design and construct Regional Utility Plant No.4 to accommodate the campus growth.

Regional Utility Plant No.4 was designed with a planned growth for 1500 tons to 2100 tons. After the first phase was completed, our team was requested to evaluate and provide a 900 ton machine for the RUP 4 expansion. The expansion brought the primary variable flow chilled water system to a maximum of 2400 tons.